LogoBlueprint
SHEET A-001 · REV 03

Occupied-Facility
Renovations.
Zero Missed
Appointments.

From single exam-room refreshes to full ED gut renovations — ICRA-compliant, code-current, schedule-guaranteed.

Enter your facility address

We'll show you healthcare projects completed within 30 miles.

340+

Projects Delivered

98.4%

On-Time Rate

22 yrs

Healthcare Focus

Modern hospital corridor with sterile white walls, clean flooring, and institutional lighting after renovation
Completed · St. Clare Medical Center · Chicago, IL

Project Outcome

12 Days Ahead

of contracted schedule

2.8% Under Budget

$340K returned to client

0 Incidents

ICRA compliance throughout

Advocate Aurora Health
Northwell Health
Banner Health
CommonSpirit Health
Mercy Health System
OhioHealth
Intermountain Healthcare
Ascension Health
HCA Healthcare
Providence Health
Sanford Health
Spectrum Health
Advocate Aurora Health
Northwell Health
Banner Health
CommonSpirit Health
Mercy Health System
OhioHealth
Intermountain Healthcare
Ascension Health
HCA Healthcare
Providence Health
Sanford Health
Spectrum Health

Every Facility Has a Breaking Point.
We've Seen Yours Before.

Matched camera angles. Same square footage. Real outcomes — measured to the day.

Outdated hospital corridor with peeling paint, narrow width, and exposed plumbing creating infection control concerns
Before · Case 01 · Exam Room Refresh

Lakewood Family Practice · Cleveland, OH · 1,240 SF

Non-Compliant ADA Corridors. Infection Risk at Every Turn.

Outdated 36-inch corridors blocked wheelchair access to three exam suites. Exposed plumbing chases — no barrier protection — created a documented infection-control failure during a routine wound-care procedure.

Renovated hospital corridor with wide ADA-compliant width, clean white walls, and seamless flooring
After · Delivered

ADA-Compliant, Infection-Controlled, Punch-List Zero.

Widened to 44-inch ADA corridor, sealed all plumbing chases with antimicrobial barrier panels, and installed seamless LVT flooring with coved base — all while three adjacent exam rooms remained in full operation.

6 Days Ahead·of 28-day schedule
0 Closures·adjacent rooms stayed open
ADA Certified·first inspection pass
Old hospital HVAC mechanical room with aging ductwork, corroded pipes, and outdated pressure control equipment
Before · Case 02 · Wing Renovation

Mercy Regional Medical Center · Youngstown, OH · 8,600 SF

Deferred HVAC. Positive-Pressure Failures. Joint Commission Notice.

A 1987-era HVAC system in the oncology wing had drifted to neutral pressure in two immunocompromised patient rooms. The Joint Commission issued a directed plan of correction with a 90-day deadline.

Modern hospital wing with new HVAC vents, clean ceiling tiles, and bright institutional lighting after renovation
After · Delivered

Positive-Pressure Restored. Joint Commission Cleared in 61 Days.

Replaced 14 air-handling units, rebalanced 34 supply and return registers, and installed continuous pressure-differential monitoring on all six oncology rooms — 29 days before the regulatory deadline.

29 Days Early·regulatory deadline cleared
6 Rooms Online·zero patient relocations
JC Closed·plan of correction satisfied
Crowded outdated emergency department with old equipment, cramped bays, and inadequate medical gas infrastructure
Before · Case 03 · Full ED Gut Renovation

St. Joseph Health System · Fort Wayne, IN · 22,400 SF

A 1990s Emergency Department. 42,000 Annual Visits. No Downtime Option.

A 14-bay ED operating at 118% capacity required a full gut renovation — new medical gas mains, trauma bay expansion, dedicated decon room, and code-compliant egress — with the department treating patients throughout.

Modern emergency department with 20 bays, new medical gas pendants, LED lighting, and clean clinical environment
After · Delivered

20-Bay ED. Medical Gas Rerouted. 0 Appointment Disruptions.

Phased 7-bay-at-a-time construction sequencing, temporary HEPA barrier systems, and a dedicated after-hours structural crew for concrete cutting and medical gas tie-ins — delivered 18 days ahead of a 14-month schedule.

18 Days Ahead·of 14-month schedule
0 Disruptions·ED treated 42K visits during build
4.7% Under·$1.2M returned to health system

The One Metric Every
Facility Director Loses Sleep Over.

When your board asks why the ED renovation slipped by three weeks, "construction delays" is not an answer. Ours never do.

0%

On-Time Delivery Rate

Across 340+ healthcare projects since 2003

0 Days

Average Days Ahead of Schedule

Measured from contracted substantial completion

0+

Healthcare Projects Completed

Acute care, ambulatory, long-term care, and specialty

0%

Average Budget Variance (Under)

Returned to client GMP — not absorbed as margin

Blueprint finished our occupied ICU corridor renovation 9 days early. My board presentation used their schedule data. First time in 12 years I didn't have to explain a slip.

Portrait of Diana Kowalski, VP of Facilities at Advocate Midwest Health

Diana Kowalski

VP of Facilities · Advocate Midwest Health

Every Code. Every Standard.
Every Inspection. First Pass.

Healthcare construction fails at the intersection of clinical operations and code compliance. We live there.

ICRA

Infection Control Risk Assessment

Class III & IV barrier construction in occupied clinical environments. All crew ICRA-certified before first tool on site.

NFPA 101

Life Safety Code Compliance

Egress, fire barrier, and smoke compartment documentation submitted with every permit set. Zero conditional COs.

ILSM

Interim Life Safety Measures

Written ILSM plan for every project phase — including temporary egress maps distributed to nursing staff before work begins.

PCRA

Patient Care Risk Assessment

Pre-construction risk assessment coordinated with infection preventionist and facility safety officer. Documented, signed, filed.

HTM

Medical Gas & HTM Compliance

ASSE 6010-certified medical gas installers. All tie-ins tested, witnessed, and documented per NFPA 99 Chapter 5.

SOC 2

ADA & FGI Guidelines

Facility Guidelines Institute 2022 standards applied to all clinical space design — clearances, finishes, and plumbing rough-in.

Core Capabilities

Occupied-Facility Phasing Plans

Medical Gas Rerouting & New Mains

Negative & Positive Pressure Rooms

ICRA Class II–IV Barrier Systems

Sterile Processing Department Fit-Outs

Emergency Department Expansions

Seismic Bracing & Structural Reinforcement

Modular Headwall & Casework Systems

Radiation Shielding (Lead Lining)

Nurse Call & Telemetry Infrastructure

Licensed In

IL · OH · IN · MI · WI · MN · MO · KY · TN · GA

Your Deferred Maintenance
Backlog Has a
Schedule Now.

Tell us your project type and whether the facility stays open during construction. A Blueprint project executive will respond within one business day with comparable completed projects and a preliminary schedule framework.

No form. No automated drip sequence.

A project executive — not a sales rep.

Comparable projects in your region within 24 hours.

“They sent me three comparable ED projects within six hours of my inquiry. One was 2.1 miles from my facility. I knew we had the right contractor before the first call.”

Portrait of Marcus Okafor, VP of Capital Projects at St. Joseph Health System

Marcus Okafor

VP Capital Projects · St. Joseph Health System

Step 01 · Select Your Project Type

Step 02 · Facility Status During Construction

Response within 1 business day.
No form. No drip.

CONSULTATION_REQUEST · FORM_REV_04 · 2026

14 Active Projects